Egbin PowerUp Internship Programme 2025 at Egbin Power Plc

Egbin PowerUp Internship Programme 2025

 

About Egbin Power Plc Lagos

Egbin Power Plc Lagos is one of the biggest additions to the electricity industry in Nigeria. Often seen as the biggest single generating power station in Sub-Saharan Africa, it was built to meet the every rising demand for electricity in Lagos and its environs.

Following the nation’s privatization exercise, Sahara, through its power division, Sahara Power Group and sundry affiliations, acquired the 1320 MW installed capacity Egbin Power Plant. We are working towards deploying a minimum of 5,000 MW of electricity generation over the next five years.

 

 

Applications are invited for:

Title: Egbin PowerUp Internship Programme 2025

Location: Lagos

 

Description

  • Egbin PowerUp Internship Experience equips students to bridge the gap between theoretical knowledge and practical application, also enhancing their skills, building their confidence, and sharpening their creativity and problem-solving abilities.
  • This Internship runs from January – June 2025.

Field of Study:

  • Engineering
  • Chemistry
  • Computer Science

Eligibility

  • Students on Second Class Upper (2:1) or its equivalent as at the time of submitting the application.

Application Closing Date
15th November, 2024.

 

How to Apply

Interested and qualified candidates should Click on ‘apply now’ below.
Click here to download the Editable CV Template here

Join our official WhatsApp community to receive daily job allerts!